From: route@monster.com
Sent: Friday, August 19, 2016 10:52 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Edwin L. Trujillo, ELTRUJILLO1252@YAHOO.COM 505-908-6619 Cell. Strong proficiency and familiarity with
industrial, civil, and architectural construction disciplines.
Well-articulated communicator with a consummate professional focus to develop
a continued expletory track record of high standard performance criteria. Experience
and expertise in estimating, project management and planning construction
renovations, demolitions and new ground up construction for various federal
government agencies and private enterprise spans over twenty years. Ability
to multi-task several projects simultaneously in documented earned value
management (EVM), protocol mandated in Federal Government FARS, SARS, UFC and
EPA guidelines. HCSS, timberline and other estimating software experience.
Complex industrial estimating / project management, dissemination of bid
packages, comprehensive site visit evaluation(s), collaboration by
multi-tasking with construction management for the composition of strategies,
risk factors, sub-contractors, vendor’s interaction and effective management
of bid process(s) for meeting bid, construction timelines and project
closeout deadlines. Employment History: · Senior Planner / Senior Estimator / Senior Project
Manager, Contract Employment, Los Alamos National Labs, (LANL), Los Alamos,
New Mexico, April 2015 to Present:
Instituting several large
maintenance and new construction projects, by composing planning packages for
the Department of Energy, (DOE), for facility maintained scheduling, task
identification, hazard risk and incorporating alternative solutions for
desired outcomes. Updating Material Equipment List, (MEL), with linked
facility wide databases, which required results for compliance(s), and
protocol mandated by / with strict enforcement and oversight by EPA, DOE, and
Federal / LANL guidelines. Interface with Subject Matter Experts, (SME),
Facility Director(s), Engineers and craft personal to ensure timely
completion dates, budgetary, safety and proper mediation techniques for
resolution(s) to the tasks presented from inception to completion. ·
Senior
Estimator / Senior Project Manager, Contract Employment, Polaris Engineering,
Lake Charles, Louisiana, February 2015 to April 2015: Several large refinery projects, industrial piping,
upgrades, retrofitting and college level glycol unit, hot models for
implementation and simulation of off shore oil and gas exploration teaching
models / modules. Ship to shore to propane distribution stations, St Croix.
Project cost controls and scheduling sequencing for budgetary control,
composing and instituting new and corrective protocol in costing and document
control. I project managed five large projects simultaneously with field
construction managers and estimated scope of work change orders utilizing all
available resources in experience, knowledge and communication skills for
successful outcomes and company profitability, receiving accolades from
Polaris owners and supervisor of office / engineering manager. ·
Senior
Planner / Senior Estimator / Senior Project Scheduler / Senior Project
Manager / Project Cost Controls Specialist, Contract Employment March 2014 to
September 2014, Ideal
engineering / Jacobs engineering / NASA Michoud NASA assembly facility, New
Orleans LA. Several large pipeline
construction project, heavy structural construction projects, large architectural
construction projects and cost estimated a 5yr. plan for electrical
substations new and upgraded construction projects, industrial piping,
architectural facility renovations, civil construction projects, heavy
structural construction projects and cost estimated 5yr. plan for electrical
substations new and upgraded electrical substations, all projects for the
composition of unit costs estimating capturing both unburdened and burdened
costs, utilizing primavera software applications, (RS Means / Cost Works),
parametric historical estimates, historical sub-contractor and vendor quotes
/ costs evaluation(s), subject matter experts (SME), all to successfully
estimate and schedule completion dates project close-outs, while implementing
Microsoft project period of performance (POP), Scope of Work (SOW), earned
value management, (EVM), for federal pay applications. Implemented project
timeline(s), to ensure mile-stone objectives enforcement and accomplishment,
to include adjusting of schedules in anticipated or projected delays and/or
accelerated periods of performance for early completion dates citing and in
conjunction with, a critical path method of accounting to ensure budgetary
guidelines and accountability. Reviewed and composed OSHA safety guidelines
pertinent to estimate construction activities. Current budgetary
configuration under my direction, totals in excess of 1.8 Billion in
industrial piping, pipeline construction, electrical sub-stations (new and
upgrades), plant operations, facility maintenance / renovations, heavy civil
/ structural construction projects there in the NASA Michoud Assembly
Facility, (New Orleans LA.). ·
Consultant
for Construction and Engineering Firms on a contract basis in Federal
Contracting and private sector construction projects November 2011 to March
2013, Senior Planner, Project Cost Controls Specialist, Estimator, Project
Manager, Project Scheduler to ensure project by project situations, statuses
or circumstances for completion and profitability. Promote a qualified and
comprehensive project management, estimate and field operations for
completion status analysis or simply evaluate an on-going project lending my
experience and expertise. Estimated several large pipeline construction
projects in both civil and industrial applications. Knowledge for objective
prospective, or for enforcement of construction guidelines and industry
practices. Individual contracts and time-lengths vary as scope of my services
is outlined by contractual agreement by position and duration as needed.
Contracted with several refineries and pipeline construction umbrella and
sub-vendors to productively ensure quality, cost control and estimate
packages for profitability. Estimated various retrofitting, shutdowns and
upgrades of refinery plants and petrochemical byproducts plants for
industrial piping and installation of additional equipment necessary in
upgrades. The industrial piping estimates referenced mechanical isometric
piping configurations (P&ID’s), and heavy civil / structural industrial
applications for several oil and gas refineries in existing facilities.
Navajo, Western and Exxon Mobile refineries to list a few although by
contractual confidentiality clauses I cannot publically name the
companies. ·
ADDECO/City
of Albuquerque NM August 2011 to November 2011, Senior Planner / Estimator /
Project Manager / Project Cost Controls Specialist / Scheduler / Project
Coordinator, Solid Waste Management Civil Infrastructure pipeline
boring and civil pipeline construction projects and installations of methane
gas recovery pipeline construction processes for the City of Albuquerque. I
was a Team Leader Senior estimator MIDSTREAM, of an aggressive industrial
piping and civil reclamation construction project, to utilize the methane gas
disbursement as a natural and viable fuel for energy heat & power
consumption. Observing and participating in all road construction, earth
buttress embankments and infrastructure of civil construction, estimating industrial
piping and timelines industrial project for the solid waste management for
the City of Albuquerque, acting an Estimator, scheduler planner P6 7.0
software application, project manager, and site superintendent regarding plan
interpretation of design/build engineered drawings and as Liaison for The
City and EPA governing bodies. Construction of holding top soil diversion and
construction of piping irrigation, diversion dam, soil reclamation and all
equipment material management supervising a team of 60+ workers,
professionals with a budgetary configuration of 5M. I was Project Coordinator
and managed all civil earth work, (cut & fill), infrastructure and civil
reclamation, following detailed civil drawings and design build statuses
meeting and exceeding criteria set forth by Federal, State and Municipal
regulations. Furthermore I have estimated several design changes, working
closely on interpretation and finalization of change orders. The project is
currently 100% completed. ·
Islands
Mechanical Contractors Inc. December 2009 to January 2011, Senior Planner /
Project Estimator / Project Manager / Project Cost Controls Specialist / QC
Construction Manager / Project Scheduler for Federal Contracting Umbrella
Contractor. Program Director of all construction design / build
estimates and project management, scheduling and planning P6 7.0 software
application, of awarded and RFP design/build contracts for Guantanamo Naval
Base, Department of the Navy, DOD, DOE and Army Corps of Engineers
construction projects. Team leader in planning and implementation for the
creation and formation of design/build estimates and project management with,
insight experience and knowledge, while maintaining and managing a
conjunctive team effort with sensitivity and insightfulness to facilitate
governmental industrial, civil and architectural Large MACC and Mini MACC
construction projects. I oversaw the designs/build projects for civil,
industrial and architectural, construction for projects totaling an annual
budgetary configuration of approximately $230,000,000.00. I was the team
leader and interfaced in the composition and delegation for the direction and
dollar amounts of all estimates, proposal composition and project management
with a supporting in-house staff of; civil engineers, structural engineers,
mechanical engineers, electrical engineers and architects. Formulized all
design/build criteria set-forth by federal regulations and guidelines, (FARS,
SARS, and UFC). Bringing a package of planning and implementing design/build
estimates and outlined project timelines and project management, based upon
request for proposal requisitions, (RFP), in civil road construction, waste
water treatment facilities, civil infrastructure , airfield electrical vault
up-grades, civil airfield taxiway and runway upgrades, existing hospital
civil and architectural renovations, marine civil wharf / pier construction,
industrial Naval fuel depots and multiple civil, architectural awarded
construction projects in apartment complexes for fire suppression and
individual base wide housing. Industrial, civil and architectural prison
facility upgrades and multiple base-wide procurement facilities for
Department of the Navy, DOD, DOE and Corp. of Engineers construction projects.
I had an entrusted assembled professional group of upper level, mid-level
and front line managers, which included; 5 General and 10 Site
Superintendents and 50 ground level foreman. ·
TKS, Carlsbad
New Mexico, Senior Planner / Estimator /
Project Scheduler / Project Manager / Cost Controls Specialist, March 2013 to
September 2013, Multiple large petro chemical
plant and civil piping construction projects. Estimated total
construction, specializing in MIDSTREAM, civil, architectural and mechanical
construction costs, pipeline boring and installation components, equipment
and manpower, employing project scheduling multiple timelines, (IE: Microsoft
Project), estimating quantities necessary in equipment, labor and Materials,
using Excel and Mc2 ICE estimating software’s, and P6 7.0 scheduling software
with a budgetary configuration of $58,576,000.00 in estimated / scheduled
construction costs in the civil, architectural & mechanical design
criteria. Developed estimate packages from design / build concepts,
articulating project costs through final plant layout. Estimated all
industrial piping, civil construction and structural steel, delivering final
unit cost estimates and total plant construction costs. Estimated industrial
piping by utilizing unit pricing to justify quantity take offs referencing
approved plans for construction which detailed isometric configurations and
P&ID’s for total estimated cost and mechanical applications. ·
Darrell
Julian Const. Inc. Albuquerque,
NM, February 2006 to November 2009,
Senior Planner / Project Estimator
/ Project Controls Specialist / Scheduler / Project Manager for Federal and
private construction projects. Involved in every aspect of estimating, proposal
composition, sub & vendor bid processes, scheduler planner, project
Management, contract documents, change order procedures, RFI's, submittals,
contract writing and development, as well as payment processes.
Multitasked several projects at the same time to exceptional
completion. Used software applications such as Timberline, Microsoft
Project, Surtrak, and other excel spreadsheets as well as Primavera. In
conducting these projects I was involved in quantity takeoff with actual and
conceptual drawings or construction (bid set) plans / drawings. The projects
estimated included several Federal Government facilities, commercial
ground-up facilities, schools hospitals and industrial facilities. ·
Britton
Construction, Inc. June 2005 to January 2006, Senior Planner / Project
Estimator / Project Cost Controls Specialist / Scheduler / Project Manager,
for Federal and private construction projects. I was a
Senior Planner / Estimator / Project Manager, overseeing several large
projects for the University of New Mexico Hospital renovations, and several
other ground up facilities at UNM campuses, totaling $14.7 million. Plus,
DOE, DOD, Dept. of the Air Force (Kirkland Air Force Base, Alb. NM), and
other projects in the private sector, including Main Bank $1.3 million, UNM
Urgent care facility $1.1 million, United South Broadway Corporation $2.3
million. Overseeing four superintendents allowed me to interface with owners,
architects, and engineers. I still managed seven other projects in various
stages of development, from planning, estimating, design, to contractual
agreements. Job description includes AlA documents for pay applications, Cost
Codes, Schedule of Values, Value Engineering, RFI, and Change Orders.
Conducted biweekly meetings with UNMH officials, UNM officials, Architects,
Engineers to determine deceive plans for completion, scheduling, with minimal
inconvenience to the public, students and safety while still being in
compliance with mandatory completion dates. ·
Telstar
Const. Inc. January 1998 to April 2005, Senior Planner / Project
Estimator / Project Manager / Project Cost Controls Specialist / Scheduler,
USPS, All construction projects in Colorado. These included two back to back post offices, one in
Highlands Ranch $3.8 million, the other in Colorado Springs $5.4 million,
while still estimating future construction prospects and supervising two other
superintendents in Aspen $3.4 million, and Westminster Colorado $4.1 million.
I interfaced with US postal representatives, Architects, Engineers,
concerning pay applications, progress reports, change orders, daily reports,
value engineering RFI’s and of course field supervision. All projects
completed on time and on budget, to the satisfaction of United States Postal
representatives and contracted engineering firms. ·
City Of Santa
Fe, Senior Planner, Cost Controls Specialist / Plan Review and Supervised the
Building Inspectors April 1995 to November 1997. I supervised the building inspectors for the city of Santa
Fe. I handled or was involved in all phases of planning, plan review,
disbursement of inspections, as well as performing numerous inspections
personally, plus various development projects for the expansion of the city’s
infrastructure and the new or existing upgrades to many industrial complexes,
business parks, boulevards and roadways. I interfaced with local zoning officials,
fire officials, and police officials, creating damage reports, certificate of
occupancy, and proposed site developments. I enforced and adhered to all
applicable laws and policies, imposed and embraced, (in charter), by the City
of Santa Fe. Several developments were nationally recognized for their
exceptional use of scheduling, planning, development, and compliance in
regards to the multiple cultural atmospheres set forth by the interactive
cultural traditions embraced by the city. NOTABLE
PROJECTS LIST: · Ongoing large industrial piping
and facility new and maintenance construction projects, Los Alamos National
Labs., Nuclear Facility, $28,000,000.00 (To Date),
2015 · Senior Estimator / Senior Project
Manager, several large oil and gas construction projects Polaris Engineering,
$35,000,000.00
2015 · Senior Planner / Senior Estimator
/ Senior Project Manager / Project Cost Control Specialist / Scheduler: NASA
Facilities: industrial pipeline construction projects, Industrial refinery
and facility industrial piping projects, New and upgraded Electrical
Sub-stations, Civil / Structural construction projects, Ground-up New
buildings and Industrial Facility renovations and upgrades: $1.8
Billion Budgetary Configuration.
2014
· Senior Planner / Senior Estimator / Senior Project Manager
/ Project Cost Controls Specialist / Scheduler: Pipeline Construction, Naval
Fuel Depots, Waste water Treatment Facility, Airfield civil construction
up-grades and several architectural ground up and building renovations,
Guantanamo Naval Base, Cuba: $64,855,437.00
2010
· Senior Planner / Estimator / Project Manager / Cost
Controls Specialist: Diversion Dam Tesuque Pueblo, NM: $98,921,000.00
2000
· Senior Planner / Senior Estimator / Senior Project Manager
/ Cost Controls Specialist: Petrol Chemical Plant, Hanford, Ca:
$58,576,000.00
2013 · Senior Planner / Estimator / Project Manager / Cost
Controls Specialist: City of Santa Fe, city wide pipeline construction
projects, infrastructure upgrades and roadway / railway projects:
$78,295,000.00
1994-1995 · Senior Planner / Senior Estimator / Senior Project Manager
/ Cost Controls Specialist: St. Croix resort, multiple Story hotel, casino
& grounds
$118,577,723.00
2009 · Senior Planner / Senior Estimator / Senior Project Manager
/ Cost Controls Specialist: City of Phoenix, county Waste water Treatment
Facility, and all pipeline construction, Glendale, AZ, $331,209,157.00
2005 · Senior Planner / Senior Estimator / Senior Project Manager
/ Cost Controls Specialist: Classic Hotel, Multi Story High Rise,
Albuquerque, NM, $71,882,497.00
1994 · Senior Planner / Senior Estimator / Senior Project Manager
/ Project Cost Controls Specialist / Scheduler: For Multiple Base-wide
ground-up & existing buildings / civil, industrial fuel depots for
facility infrastructure, new pipeline construction projects and existing
civil infrastructure roadways and up-grades, Kirkland AFB, Albuquerque, NM,
$147,522,443.00.
2003-2004
· Senior Planner / Senior Estimator / Senior Project
Manager, Four Corners regional pipeline construction projects (under
consultant contract), for oil and natural gas supplier(s) disbursements as a
contracted consultant employee for various large Umbrella contractors and
sub-contractors in the four state areas.
$52,178,443.00
1999 & 2001
· Senior Planner / Estimator / Project Manager / Cost
Controls Specialist / Scheduler: (Under Contract / Consultant), in several
refinery, Oil and Gas refinery upgrades, shutdown retrofitting / retooling.
$280,577, 332.00.
2004-Present 20+
years of experience, in Industrial, Civil and Architectural construction
projects, Federal Cost Estimating / Senior Project Management / Senior
Estimating, Senior Project Planner / Cost Control Specialist. Thank
you for your consideration……………Edwin L. Trujillo |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Italian |
Beginner |
|
|
Spanish |
Advanced |
|
|
Tagalog |
Beginner |
|
|
|